Monday, August 27, 2012

Back and Ready for More

Janell and I returned from our honeymoon and I had another week off school. I used it as an opportunity to work full time and to get caught up with to dos around the triplex. I patched the holes Papa Bert put in the walls in the bathroom and installed a pair of cabinets, one with a sink and the other over the toilet.
This week a lot of my bosses tenants moved out and were replaced. Some of them left a rotted hole in the floor that I patched up.

No comments:

Post a Comment